Skip to main content

Overview

A conversation, a Studio file, and a connected Revit or AutoCAD document are different records. Saving one does not establish that the others are saved. After inspecting a native change, save the application document using the appropriate project procedure. Keep useful Studio files in Projects and reopen the result to verify it.

In Ideatura

  1. Identify whether the result is a Studio file or a native application change.
  2. Save the native document where required.
  3. Organise useful files in Projects.
  4. Reopen the result and check content and editability.

Check the result

The usable result survives closing and reopening the relevant file.